Lime Pile
This method of pile is to improve the soft clay layer by using both partially replaced lime piles with/without confinement. This research is performed to study the effect of lime pile to improve the bearing capacity and to control the settlement. Also the research aimed at investigating the variation of subgrade modulus, and the induced failure mechanism of shallow circular footing on replaced soil with/without skirts. The results show that the improvement of load bearing capacity is remarkable; using both partially replaced sand pile with and without confinement by skirts.
The adopted technique can substantially modify the stress displacement curve of the footing rested on soft clay layer, significantly decreases the settlement and the replaced soil block inside the skirts behave as deep foundation. Therefore, the bearing capacity failure mechanism of a footing rested on soft clay can be modified from exclusive settlement to general bearing capacity failure at the tip of confined replaced sand column.
- BORED CAST IN-SITU PILE
- DRIVEN CAST IN-SITU PILE
- DRIVEN PRECAST PILE
- STONE COLUMN PILE
- UNDER REAMED PILE
- CONTIGUOUS PILE
- SHEET PILE
- SECANT PILE
- SAND PILE
- LIME PILE
- MICRO PILE
- BARGE PILE
- GANTRY PILE
- BORED COMPACTION PILE
- VERTICAL LOAD TEST
- PULL OUT TEST
- LATERAL LOAD TEST
- PILE INTEGRITY TEST
- PILE DYNAMIC TEST